Loadmaster Roof Deck Retrofit System Process
RETROFITTING EXISTING LOADMASTER ROOF DECKS
Roof coverings applied over a Loadmaster Roof Deck require removal when two roof coverings have worn out an original roof covering and a roof recovering.
Low Sloped Roofs (2/12 or less)
The International Building Code (IBC) limits roof coverings installations to two roofs on a building. The above image shows a Loadmaster Roof Deck after the removal of the two roof coverings. Roof removal loosens the screw attachments and removes several layers of board facer material, causing the assembly to no longer pass IBC regulations.
Steep Sloped Loadmaster Roofs (> 2/12)
Roof coverings on steep sloped Loadmaster Roof Decks can vary substantially but are generally attached with nails, screws, or mechanical devices. Old asphalt shingles are removed by force during the retrofit, which can cause damage to the top surface of a roof deck and the connecting components, potentially losing structural composite strength during the process. Because of this, installing a new layer of Duraflex over the existing roof deck with its appropriate screw attachment is required to fully protect the roof.
For retrofit instructions or a list of other types of roof coverings contact Loadmaster Technical Department at 800-527-4035.